Skip to Content, Navigation, or Footer.
Saturday, Nov. 23, 2024
The Emory Wheel

New year, New campus

The University made a series of recent structural changes around campus, digging to repair leaks at the Callaway Center, removing and replacing a dying oak tree on the Quadrangle, a new login system for Robert E. Woodruff Library resources and a new system of reserving group study rooms at Woodruff Library and the Cox Hall Computing Center (see Page 3 for more).
Photo by Hagar Elsayed / Photo Editor


The University made a series of recent structural changes around campus, digging to repair leaks at the Callaway Memorial Center, removing and replacing a dying oak tree on the Quadrangle, a new login system for Robert W. Woodruff Library resources and a new system of reserving group study rooms at Woodruff Library and the Cox Hall Computing Center.